Don't get lost: IMan Guides » IMan User Guide » Scheduling » Integration Concurrency

Integration Concurrency

When an integration is run via any of the listed methods, the number of concurrent integrations is limited by the setting defined on the design tab.

Where the maximum concurrency for an integration is exceeded, the integration instance will be aborted, and an error is written to the \Debug\Errors.txt file.